PRODUCT
What is the “N-EB series”?
An electronic breaker is a product developed to significantly reduce the basic charge for low-voltage electricity.
The “N-EB series” has passed the compatibility test by JET (Japan Electrical Safety and Environment Laboratory), a registered inspection organization, and is a safe breaker that complies with the safety standards stipulated by law.
Based on many years of sales performance, some electric power companies have accepted applications for contract changes by omitting or simplifying conformity inspections and by registering for approval of the “N-EB series”.
1.Difference between load equipment contract and main breaker contract
There are two methods of calculating the power capacity between the power company and the customer.
One is a method of calculating from the total output capacity of the equipment placed at the customer’s site.
The other method is to use the capacity of the main switch (the ampere size of the breaker installed at the base).
2.It is the electronic breaker that penetrated the main switch contract that did not penetrate
The built-in CPU measures the current flowing through the breaker and the energization time, realizing precise operating characteristics not found in conventional breakers.
Benefits
We can provide it to companies in various industries, and we will deliver the voices of happy customers.
Introduction flow
The industry of door-to-door sales seen through colored glasses. Depending on the content and objects, it is opaque and leaves a lot of anxiety.
Based on the words of one of our customers, we are doing business in a safe and secure way.
1.Explanation of the system
Our sales person will visit your factory at the time you made an appointment. We will explain everything from the structure of the electricity bill, why it is cheaper, and the procedure for introducing the “N-EB series”. If you have any questions, please do not hesitate to ask.
2.measurement survey
If you can understand the explanation of the system, we will actually investigate the operation status of the customer. In order to propose the best plan for each customer, we will actually move the machine and check the work process.
This is a very important survey for the introduction of the “N-EB series”, so we ask for your cooperation.
3.Proposal of reduction plan / Approval
Based on the results of the measurement survey, we will determine the optimum capacity for the customer and propose a reduction plan for the customer. This will reduce the fixed cost of the basic charge, so we can present a reduction amount that is accurate in units of 1 yen. If you are satisfied with the contents of the proposal, we will apply.
4.Application to power company / Confirmation of reduction
Since the contract with the power company will be changed, we will apply to the power company for a change to the main switch contract. All procedures related to the application will be handled by our company. After the application has been accepted by the electric power company, the customer can confirm with the electric power company that the basic charge has been changed.
5.Reduction confirmation, installation work, trial operation
You can see the results as suggested.
※If the reduction amount is different from the proposed amount, the application will be withdrawn.
After accepting the application to change the electric power company, we will visit you for the installation work of the “N-EB series”. As this is an electrical work, there will be a power outage for about 15 to 20 minutes during wiring. After the installation is complete, we always conduct a test run in the presence of the customer to confirm that normal operation is possible without any problems even if the contracted capacity is lowered.
※The connection time is only a guideline and may vary depending on the construction work.
6.Conclusion of contract
After confirming that the basic charge will be reduced as proposed by the customer and confirming that the “N-EB series” will not fall, the contract will be concluded.
7.Confirmation/inspection of electric power company
After the installation of the NEO Control System “N-EB Series” is completed, confirmation and inspection will be carried out by the electric power company, but many electric power companies will apply changes to the basic charge on a daily basis from the date of installation completion.
Please note that the reduction may not be as proposed at the time of billing for the first month, depending on the date of installation and the date of meter reading.
※Depending on the electric power company, the order of 4 to 7 may be different.
※The effective date of the change to the basic charge varies depending on each electric power company. Please contact your sales representative for details.
Frequently Asked Questions
Here are some frequently asked questions from our customers.